Building Absortion on Jalan Malabar
Date: 2 Oct 2005 / Views: 593 / Print
Building receiver pool surface water overflow as large as 551m2
Building drainage by using bony concrete pipe on centrifugal system as long as 25 m wit diameter 1,5 m
Provided of receiver area of surface water overflow and water removal place for park watering
Controlled of puddle and flood on Jalan Malabar area and decrease burden of city drainage
The advantage: increase comfort, safety and stability of environment on Jalan Malabar area. Efficiency of hydrant water of PDAM using for the city park on the dry season
Increase living environment preservation and the beauty of area.